Wright 2 edit.jpg

How does
installation work?

A project manager confirms your roof measurements and solar production. We will need access to your electrical panel and attic space (if you are installing on your roof)
— Site Assessment (1-2 Weeks)
Our engineering team generates your final design and electrical drawings for submission to the town and utility. We will ask you to approve your design before we submit anything.
— Engineering and Design (4-5 Weeks)
We apply for permits and interconnection with your town and utility, respectively.
— Permits and Interconnection (4-6 Weeks)
Our installation team installs and hard-wires your solar system.
— Installation (1-2 Days)
Our team schedules an inspection with your town’s building department to ensure quality and safety of your installation.
— Inspection (1-2 Weeks)
Your utility will visit your home and install a net meter. They will then email you with permission to energize your system.
— System Activation (4-6 Weeks)
Your project manager will walk you through your system and answer any additional questions you may have
— Final Walkthrough (1-2 Weeks)