How does installation work? A project manager confirms your roof measurements and solar production. We will need access to your electrical panel and attic space (if you are installing on your roof) — Site Assessment (1-2 Weeks) Our engineering team generates your final design and electrical drawings for submission to the town and utility. We will ask you to approve your design before we submit anything. — Engineering and Design (4-5 Weeks) We apply for permits and interconnection with your town and utility, respectively. — Permits and Interconnection (4-6 Weeks) Our installation team installs and hard-wires your solar system. — Installation (1-2 Days) Our team schedules an inspection with your town’s building department to ensure quality and safety of your installation. — Inspection (1-2 Weeks) Your utility will visit your home and install a net meter. They will then email you with permission to energize your system. — System Activation (4-6 Weeks) Your project manager will walk you through your system and answer any additional questions you may have — Final Walkthrough (1-2 Weeks)